Critical data (wellbore parameters, equipment status, geology) is scattered across systems,making traditional data acquisition and integration highly challenging.
Hazards like kicks, losses, or stuck pipe rely on manual detection, leading to delayed warnings.
Non-productive time remains excessive, with drilling delays caused by equipment failures, waiting for instructions, and time-consuming complex operations.
Manual reporting delays information, slowing response to complex situations.
Lack of real-time benchmarks for drill rate, cost, and contractor performance hinders efficiency gains.